Mercury 200 Optimax Manual de instalación Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
200/225/250 OPTIMAX
Page 15 of 38
Installation
IMPORTANT: Step 1 must be followed for proper adjustment of the shift cable.
1. Locate the center point of the slack or lost motion that exists in the shift cable as follows:
a. Move the remote control handle from neutral into forward and advance the handle
to full speed position. Slowly return the handle back to the neutral. Place a mark (a)
on the cable against the cable end guide.
b. Move the remote control handle from neutral into reverse and advance the handle
to full speed position. Slowly return the handle back to the neutral. Place a mark (b)
on the cable against the cable end guide.
c. Make a center mark (c), midway between marks (“a” and “b”). Align the cable end
guide against this center mark when installing cable to the engine.
STANDARD ROTATION OUTBOARDS
a
b
c
COUNTER ROTATION OUTBOARDS
b
a
c
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 37 38

Comentarios a estos manuales

Sin comentarios